Difference between revisions of "Introduction to project management/IPM103/Resources/Start Resources"

From WikiEducator
Jump to: navigation, search
(Tag: visualeditor)
(Tweaking)
Line 1: Line 1:
In this activity you will work out the resources required for each task in your own project. You can draw on a range of the techniques to estimate resources required and duration of activities. At this stage all that is required is what you need. When you look at time and scheduling we can integrate what you need with when it is or is not available.
+
{{E-tivity title
 +
|heading = Challenge summary
 +
|summary = Estimate your resources
 +
|time = 2 hours {{note|How long will this take}}
 +
|assignment = {{:Introduction_to_project_management/Links/IPM103/Assignment}}
 +
|body =
 +
}}
 +
 
 +
==Start here==
 +
 
 +
{{IDevice
 +
|theme= Line
 +
|type = Web resources
 +
|title = Stimulus resources
 +
|body=
 +
*  LIST RESOURCES NEEDED FOR THE ACTIVITY
 +
}}
 +
 
 +
 
 +
{{IDevice
 +
|theme= Line
 +
|type=Objectives
 +
|title=Purpose
 +
|body =
 +
* LIST OBJECTIVES FOR ACTIVITY
 +
}}

Revision as of 14:09, 6 November 2016

Icon summary line.svg
Challenge summary
Summary: Estimate your resources
Time7.svg
2 hours (Comment.gif: How long will this take)
Font2.svg
The learning challenges at the end of each learning pathway will all contribute to the assessment



Start here

Icon inter line.svg
Stimulus resources
  • LIST RESOURCES NEEDED FOR THE ACTIVITY



Icon objectives line.svg
Purpose
  • LIST OBJECTIVES FOR ACTIVITY